Glossary

Construction estimating glossary for UK project teams

Plain-English definitions for common construction estimating, tendering and QS terms.

Illustration: a construction reference book surrounded by miniature building components
4 min read by QuotifyReviewed 14 July 2026.AI-generated editorial illustration.
In this guide

A plain-English primer for estimating, tendering and QS terms.

  • Why terms matter
  • Common groups
  • Use the glossary beside the quote
  • Use a controlled vocabulary
  • Resolve ambiguous wording

Why terms matter

Pricing terms affect what is included, provisional and risky.

Common groups

Most terms relate to measured work, allowances, tendering, variations, cost planning and commercial review.

Use the glossary beside the quote

Shared definitions help clients, architects and builders review the quote on the same basis.

Use a controlled vocabulary

Choose one term for each commercial concept and use it consistently across the estimate, tender comparison and client pack. If the contract documents define a term differently, follow the project definition and make that clear.

Resolve ambiguous wording

Words such as allowance, estimate and provisional can carry different meanings. When the commercial effect matters, add the amount, scope covered, adjustment method and person responsible for confirmation.

Review checklist

  • Define terms at first use
  • Use the same wording in every project output
  • Link allowances to a clear scope
  • Check project-specific contract definitions
Alphabetised construction reference cards beside a drawing and scale ruler
Construction estimating glossary for UK project teams editorial reference.

FAQs

What is a construction estimating glossary?

A set of definitions for terms used in estimates, tender documents, quote packs, BOQs and QS reports.

Why do estimating terms cause confusion?

Terms such as PC sum, provisional sum and variation affect price and risk, so they need consistent use.

Use this thinking on a real project pack

Send drawings, specifications, notes or a current quote. Quotify will show how the project can be structured for review.

Related Articles

Continue learning

Illustration: architectural material samples and an unlettered supplier pack beside a cutaway wall model

How to check construction material prices before submitting a tender

Check the materials that can move the tender, compare the correct buying basis and record exactly which prices still need confirmation.

Read guide
Illustration: three trade assemblies with quotation packs arranged for comparison

How to compare subcontractor quotes before using them in an estimate

Compare subcontractor quotations on scope, programme, attendance and commercial basis before choosing the number that enters the estimate.

Read guide
Illustration: timber-frame construction stages and carpentry tools illustrating labour planning

How to calculate labour cost in a construction estimate

Build labour cost from a defined employment cost, realistic productive time and project-specific output—not a wage multiplied by nominal days.

Read guide