Free construction worksheet

Measured work and pricing worksheet

Keep quantities, units, source references and pricing decisions connected.

Use a blank copy or follow the example

These files give you a starting structure you can adapt to your project. The CSV is an editable manual worksheet, not an automatic calculator or an application import file. Keep your evidence and check the calculations in your working copy.

Completed example preview

Hypothetical measurement extract. The three extensions sum to £6,930 ex VAT. The assumed making-good item remains an allowance rather than a measured quantity.

ReferenceWork descriptionDecision or review note
B01Specified wall liningCheck against current drawings
B02Decoration to wall liningConfirm finish and preparation
B03Local making goodAllowance pending confirmation

How to use it

  1. Use a stable reference for every line and record the exact measurement source and revision.
  2. State whether the quantity was supplied, measured/derived or assumed. Check the unit before applying a rate.
  3. Calculate quantity × rate in the working copy and check important extensions independently.
  4. Keep allowances and qualifications visible. This is a contractor worksheet, not evidence that a professional has measured or certified a BOQ.

Fields in the worksheet

  • Item reference
  • Work description
  • Source and revision
  • Quantity basis
  • Quantity
  • Unit
  • Rate ex VAT GBP
  • Extension ex VAT GBP
  • Scope qualification
  • Review status

Continue with the matching guide

Read the practical guidance or follow the Academy task.

Put this into practice on your next project

Your first complete project is free, including the estimate, risk information, client reports and internal reports. Bring your drawings, specification and site notes, then review the working against how your business will deliver the job.