B01: Specified wall lining
- Item reference
- B01
- Work description
- Specified wall lining
- Source and revision
- Illustrative schedule A03
- Quantity basis
- Supplied quantity
- Quantity
- 120
- Unit
- m2
- Rate ex VAT GBP
- 42
- Extension ex VAT GBP
- 5040
- Scope qualification
- Defined system; access assumed
- Review status
- Check against current drawings
B02: Decoration to wall lining
- Item reference
- B02
- Work description
- Decoration to wall lining
- Source and revision
- Illustrative finish schedule
- Quantity basis
- Derived from lining area
- Quantity
- 120
- Unit
- m2
- Rate ex VAT GBP
- 12
- Extension ex VAT GBP
- 1440
- Scope qualification
- Standard finish; number of coats stated
- Review status
- Confirm finish and preparation
B03: Local making good
- Item reference
- B03
- Work description
- Local making good
- Source and revision
- Illustrative opening detail
- Quantity basis
- Assumed allowance
- Quantity
- 1
- Unit
- item
- Rate ex VAT GBP
- 450
- Extension ex VAT GBP
- 450
- Scope qualification
- Extent awaits opening-up
- Review status
- Allowance pending confirmation
Use it on your project
- Use a stable reference for every line and record the exact measurement source and revision.
- State whether the quantity was supplied, measured/derived or assumed. Check the unit before applying a rate.
- Calculate quantity × rate in the working copy and check important extensions independently.
- Keep allowances and qualifications visible. This is a contractor worksheet, not evidence that a professional has measured or certified a BOQ.