Fixed-price work can be profitable, but only when the price reflects the real scope and the builder knows which assumptions are being carried. The review stage is where a rough estimate becomes a controlled quote pack. It is not just a final spell-check. It is a commercial check on what the business is about to promise.

What a fixed-price quote risk review covers

A useful risk review looks at the quote from three angles: what is included, what is uncertain and what the builder is still deciding. The aim is to stop hidden assumptions becoming unpriced obligations.

  • Scope risk: Is every major work package represented?
  • Information risk: Which prices depend on incomplete drawings, missing schedules or unclear specifications?
  • Allowance risk: Are PC sums, provisional sums and contingencies separated?
  • Delivery risk: Are access, protection, waste, programme, prelims and site constraints priced?
  • Margin risk: Has margin been added after the cost basis is clean, or is margin covering missing scope?

A simple risk register for builders

Risk area What to check Good sign Warning sign
Drawings and specs Are all packages supported by drawings, specs, notes or sensible assumptions? Each package has a basis. Large packages priced from memory.
Groundworks and drainage Has access, spoil, drainage route and unknown below-ground work been allowed for? Assumptions are listed. One lump sum covers everything.
Structure Are steels, temporary works and engineer changes treated properly? Engineer-dependent items are qualified. Final structural cost assumed from outline drawings.
Client selections Are kitchens, sanitaryware, tiles, ironmongery and finishes separated where needed? PC sums and supply choices are visible. Client selections are buried in the main total.
Preliminaries Are management, protection, welfare, waste and access included? Prelims are their own package. Prelims are expected to come out of margin.

The review flow before sending

  1. Read the quote by package. Do not start with the total. Start with the scope breakdown.
  2. Check the assumptions column. If assumptions are missing, the quote is not ready for a fixed-price decision.
  3. Review exclusions separately. Exclusions should be clear enough that the client cannot reasonably assume the work is included.
  4. Check provisional and PC sums. Confirm whether the number is an allowance, a supply item, an install item or a full package.
  5. Check margin and contingency last. Margin should reward the business. It should not quietly pay for undefined scope.
Useful test

Ask: if the client accepted this quote tomorrow, which parts would still make the builder uneasy? Those items should be visible in the review pack before the quote leaves the business.

Example risk review notes

Internal builder note

Roofing price assumes warm flat roof build-up and standard warranty. Structural steel provisional pending final engineer schedule. Drainage alterations allowed as provisional due to unknown existing run. Client tile selection excluded from base supply cost. Electrical package assumes standard room layout and excludes specialist lighting.

That internal note does not need to be copied word for word into the client quote. It gives the builder a clear decision point: include, qualify, exclude, ask for information or adjust the price.

How Quotify helps with quote risk review

Quotify turns the project pack into structured quote working before the final number is sent. It separates labour, materials, plant, subcontractors, prelims, assumptions, PC sums, provisional areas, exclusions and missing information. The builder reviews the output and controls the final decision.

That matters because the fastest way to improve a fixed-price quote is often not a better spreadsheet. It is making the commercial risk visible early enough to act on it.

Want a second pass before the quote goes out?

Send the project details and any drawings, specs, notes or existing quote files. Quotify will review whether the pack is a fit and show how the quote risk can be separated before client commitment.